TENT A SYSTEM FOR MEASURING SPEED

MANUFACTURING AND INSTALLATION OF A DEVICE FOR ROTATIONAL SPEED MEASURING OF THE TURBINE. GENERATOR NO. 2 (210 MW)

In the Thermal Power Plant “Nikola Tesla” Obrenovac, modernized turbine speed measuring system was designed and installed by IMP Project ENGINEERING.

A new device for turbine speed measuring was installed. This device is a part of turbine control and protection system.

After installation, all needed tests and commissioning were conducted.