REFERENCES
REFERENCES IN FIELD OF MECHANICAL ENGINEERING, FLUID MECHANICS AND REGULATING,”INSTITUT MIHAJLO PUPIN” – PROJEKT INŽENJERING
NO |
YEAR |
CONTRACTOR |
WORK DESCRIPTION |
178 | 2023 | Flash Srb doo | Design and installation of a solar power plant (capacity 1500 kW) |
177 | 2023 | Fiorano doo | Design and installation of a solar power plant (capacity 800 kW) |
176 | 2023 | Gordon doo | Design and installation of a solar power plant (capacity 600 kW) |
175 | 2023 | M&L International doo | Design and installation of a solar power plant (capacity 81 kW) |
174 | 2023 | EPS JSC, Branch TPP-CP Kostolac | Revitalisation of transport and turn mechanisms of Mobile Transfer Conveyor BRs-2400 |
173 | 2023 | Brandt GmbH | Auger segments |
172 | 2023 | STASTO Automatizacija doo | Hydraulic system for lifting railcar |
171 | 2022- | EPS, Branch TPP Nikola Tesla | Pneumatic control devices |
170 | 2022 | NIS | Renting and installation of acoustic blowers for cleaning the economizer section of the steam boiler |
169 | 2022- | EPS, Branch TPP-CP Kostolac | Voith hydrodynamic coupling |
168 | 2022- | EPS, Branch TPP Nikola Tesla | Hydraulic coupling for the feed pump R17K |
167 | 2022 | EPS, Branch TPP-CP Kostolac | Metal detection and separation facility |
166 | 2021-2022 | Ep Belt | Design and installation of a solar power plant (capacity 398 kW) |
165 | 2022 | Comel doo | Cable protector ramp |
164 | 2022 | Green Loop | Study on the quantities and types of non-hazardous and hazardous construction waste in the territory of the Municipality of Negotin |
163 | 2022 | EPS, Branch TPP Nikola Tesla, TPP Kolubara | Overhaul of the electropneumatic control device of safety valves |
162 | 2022 | Kolubara Univerzal (Continental) | Installation of safety equipment on the two-roll mill in the rubber and technical goods production facility |
161 | 2022 | Kolubara-Univerzal (Continental) | Reparation of hydraulic parts |
160 | 2020-2022 | EPS, Branch TPP Nikola Tesla | Hydraulic couplings for 2 mills (Voith) |
159 | 2022 | Comel doo; JP EPS | Mechanical project for the reconstruction of the overhead crane 125/25t HPP Uvac |
158 | 2022 | EPS, Branch TPP Nikola Tesla, TPP Morava | Reconstruction of the steel structure of the rotary excavator: Parts for the central lubrication system of the rotary excavator |
157 | 2022 | Kolubara-Univerzal (Continental) | Troubleshooting of directional control valves |
156 | 2022 | EPS, Branch TPP-CP Kostolac | Delivery and installation of hydraulic cylinders on platform B |
155 | 2022 | EPS, Branch TPP Nikola Tesla, TPP Morava | Spare parts for air preheaters (luvo) |
154 | 2022 | EPS, Branch TPP Nikola Tesla, TPP Kolubara | Overhaul of a Voith coupling |
153 | 2021-2022 | EPS, Branch TPP-CP Kostolac | Reducer for the upper structure rotation drive |
152 | 2021 | Comel; EPS, Branch TPP-CP Kostolac | HV cable repairing station, type MNR-20 |
151 | 2021 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the transporter on the bucket wheel excavator |
150 | 2021 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the rotary railcar dumper and delivery of parts |
149 | 2021 | EPS, Branch TPP-CP Kostolac | Maintenance of Voith coupling 650 SVTL 2 |
148 | 2020 | Ministry of Justice, Belgrade District Prison | Adaptation of custody blocks (basic and main design) |
147 | 2020 | EPS, Branch TPP Nikola Tesla, TPP Morava | Delivery of drive gears and driven gears |
146 | 2020 | EPS, Branch TPP Nikola Tesla, TPP Kolubara | Overhaul of the electropneumatic control device of safety valves |
145 | 2020 | EPS, Branch TPP-CP Kostolac | Reconstruction of hydraulic installations on the after burning grate drives of unit B2 |
144 | 2020 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of rotary railcar dumper with purchase of materials |
143 | 2020 | EPS, Branch TPP-CP Kostolac | Revitalization of Voith couplings on feed pumps |
142 | 2020 | J. M. Voith SE & Co. KG VTA | On site measuring of the key parameters requested and instructed by Voith in TPP Kosovo B, Kosovo |
141 | 2020 | EPS, Coal Mine Basin Kolubara | Extractor E-7 |
140 | 2020 | SOE “District Heating” Požarevac | Main design of pressure raising station |
139 | 2019-2020 | EPS, Branch TPP Nikola Tesla | Parts for Voith hydraulic coupling of feed pumps |
138 | 2019 | EPS, Branch HPP Đerdap | Delivery of power units for lubrication |
137 | 2019 | EPS, Branch TPP-CP Kostolac | As-built design of reconstruction of hydraulic system on excavator SRS-400 |
136 | 2019 | SOE “District Heating” Požarevac | Design for building permit of pressure raising station |
135 | 2019 | MITNIK Mechanical institute | Consults regarding designing a system for maintaining hydromotor performance |
134 | 2019 | Football Club Crvena Zvezda | Study with urbanistic and architectural basic design for Sport Center Kovilovo |
133 | 2019 | City Municipality Kostolac | Design for construction of heat transfer station, connecting heat pipes, distribution heat network and standard connections on “Jezero” in Kostolac |
132 | 2019 | MITNIK Mechanical institute | Reconstruction of two-cylinder horizontal plate press |
131 | 2019 | EPS, Branch TPP Nikola Tesla, TPP Morava | Oil tanks for rotary railcar dumper |
130 | 2019 | EPS, Hydro Power Plants; Institute Mihajlo Pupin – Automatika | Hydraulic part of the turbine regulator for 7 mini hydro power plants |
129 | 2019 | EPS, Branch TPP Nikola Tesla | Reconstruction of trolley control system of lines T5L and T5R |
128 | 2019 | Republic Hydrometeorological Service of Serbia | Design of machine installation changes |
127 | 2019 | IMP – Beel | Delivery, installation and commissioning of power supply devices for signaling and safety devices for a railway as part of a project of securing a railroad part Smederevo-Mala Krsna (railway station Smederevo Port and railroad junction Jezava) |
126 | 2019 | City Municipality Kostolac | Design for construction of heat transfer station, connecting heat pipes, distribution heat network and standard connections on Bazenska street in Kostolac |
125 | 2019 | EPS, Branch Panonske TPP-HP Novi Sad | Adaptation and repairment of H2 and CO2 gas installation for generator colling in TPP-HP Novi Sad |
124 | 2019 | CRE International doo | Technical control of mechanical engineering part of a design |
123 | 2019 | EPS, Branch TPP-CP Kostolac | Overhaul of Voith coupling and delivery of parts |
122 | 2019 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the rotary railcar dumper and delivery of parts |
121 | 2019 | Methanol & Acetic Acid Complex Kikinda | Modernisation of turbine regulation of compressor 11KT01 |
120 | 2019 | EPS, Branch Panonske TPP-HP Novi Sad | Technical documentation for hydrogen cooling system for generator |
119 | 2019 | EPS, Branch HPP Drinsko-Limske | Reconstruction of compact power unit in HPP Zvornik |
118 | 2019 | SOE “District Heating” Požarevac | Basic design of pressure raising station |
117 | 2019 | Elektromontaža *EPS, Branch HPP Đerdap |
Review and verification of mechanical part of Main design and As built Design of revitalization of compact power unit in HPP Vrla 1 |
116 | 2019 | EPS, Branch TPP Nikola Tesla | Basic design of connecting the units A3 and A4 to the Obrenovac district heat network |
115 | 2019 | Institute Mihajlo Pupin d.o.o. | Troubleshooting and maintenance of hydrophor facility and chlorine dosing system |
114 | 2019 | NIS a.d. | Reconstruction of boiler BF-9501 for short-term and temporary increase of power station boiler capacity |
113 | 2019 | NIS a.d. | Design for Installation adaptation for heating BF 9601 & 9602 boiler feed water |
112 | 2018 | Ministry of Justice, Belgrade District Prison | Design documentation for: -Adaptation of custody block of Belgrade District Prison; -Modification of second floor custody lighting with ceiling lowering |
111 | 2018 | Obstetrics and Gynecology Clinic “Narodni front” | Design for medical gases: adaptation of third floor compartment of Neonatology department, OGC “Narodni front” |
110 | 2018 | City Municipality Kostolac | Design for construction of heat transfer station, connecting heat pipes, distribution heat network and standard connections on “DHS Gradska pijaca” Kostolac |
109 | 2018 | Ministry of Defense, Military Technical Institute | Repair of hydraulic subsystem for lower bending board of flexible nozzle |
108 | 2018 | SOE “District Heating” Požarevac | Technical reports of new Designs for heat-transferring objects |
107 | 2018 | EPS, Branch TPP-CM Kostolac | Overhaul of the rotary railcar dumper |
106 | 2018 | Voith Hydro GmbH & Co.Kg Branch Belgrade – Stari grad | Standardization of technical documents for As-built Design of HPP Zvornik reconstruction |
105 | 2018 | EPS, Branch TPP Nikola Tesla, TENT A | Electro-pneumatic control units for controlling boiler safety valves |
104 | 2017 | EPS, Branch TPP-CM Kostolac | Reconstruction of hydraulic system on excavator SRS-400 |
103 | 2017 | PU “Beogradske elektrane” | Design documentation for boiler room reconstruction for cadastral community Resnik and transition to environmentally friendly fuel |
102 | 2017 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the rotary railcar dumper |
101 | 2017 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the system for central lubrication of railcar dumper and rotating excavator |
100 | 2017 | EPS, Branch TPP Nikola Tesla, TENT A | Secondary circuit of Voith fluid coupling R17K |
99 | 2017 | EPS, Branch TPP Nikola Tesla, TENT A | Pneumatic control units for safety valves |
98 | 2017 | EPS, Branch TPP Nikola Tesla, TPP Kolubara | Overhaul of feed pumps and Vpoith hydraulic couplings in TPP Kolubara |
97 | 2017 | EPS, Branch TPP Nikola Tesla, TENT B | Hydraulic drive for lifting of cutting boom on the bucket wheel excavator |
96 | 2017 | EPS, Branch TPP Nikola Tesla, TPP Kolubara | Overhaul of the electropneumatic control device of safety valves on K3; Annual maintenance of electropneumatic control devices of safety valves at facility (161 MW unit and 110 MW unit) |
95 | 2017 | EPS, Branch HPP Đerdap 1 | Reconstruction of automatic lubricating system on the ship lock |
94 | 2016 | City Municipality Kostolac | Design of heat network for Ostrovo village |
93 | 2016 | EPS, Branch TPP-CM Kostolac | Revision and technical control of the project for heating the crusher plant at the ash dump Ćirikovac |
92 | 2016 | Kučevo Municipality Administration | Basic design of reconstruction and adaptation of Cultural Center Kučevo |
91 | 2016 | EPS, Branch TPP Nikola Tesla, TENT B | Level measuring chambers |
90 | 2016 | Methanol & Acetic Acid Complex Kikinda | Reconstruction of turbine regulation system (16 MW) |
89 | 2016 | EPS, Branch TPP Nikola Tesla, TPP Morava | Overhaul of the rotary railcar dumper and delivery of parts |
88 | 2016 | EPS, Branch TPP-CM Kostolac | Revitalization of Voith couplings for feed pumps |
87 | 2016 | EPS, Branch TPP Nikola Tesla, TPP Morava | Regulation drives on mixture channel shutters |
86 | 2016 | EPS, Branch TPP Nikola Tesla, TPP Morava | Replacement of boiler reducer |
85 | 2016 | EPS, Branch HPP Đerdap, HPP Pirot | Reconstruction of the system for powerspeed protection on the units 1 and 2 in HPP Pirot |
84 | 2016 | EPS, Branch TPP Nikola Tesla | Overhaul of the control device of safety valve on K3, annual maintenance of control device of safety valves on K1, K4, K5 and K6 |
83 | 2016 | EPS, Branch TPP-CM Kostolac | Reparation of Voith couplings for mills |
82 | 2016 | EPS, Hydro Power Plants; Institute Mihajlo Pupin – Automatika | Hydraulic part of the turbine regulator for 7 mini hydro power plants |
81 | 2016 | Public Water Management Company “Vode Vojvodine” | Adaptation of Main design documentation for repair of lock and sluice “Šebešfok” according to the new Planning and Construction Law |
80 | 2015 | Ministry of Justice, Belgrade District Prison | Design of adaptation of custody blocks of Belgrade District Prison; Design of parking space on building yard; Design of flour silo |
79 | 2015 | EPS, Branch TPP-CM Kostolac | District heat network in TPP-CM Kostolac |
78 | 2015 | PU “Beogradske elektrane” | Main Design of supplying cadastral municipality Železnik with natural gas as main fuel |
77 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Maintenance of electro-pneumatic control devices of safety valves |
76 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Reconstruction of the vibrating screen drive in the TPP “Nikola Tesla” |
75 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Design and consulting services – Part 1 – Design for the district heating substation in “TPP-CM Kostolac” |
74 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “PANNONIAN THERMAL POWER PLANT-HEATING PLANT” | Elaboration of Main design, As-built design, assembly and disassembly of the equipment, examination and startup of the modernized turbine control and protection system in the TPP-HP Novi Sad |
73 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Design of the control valve and accompanying steam bypass pipeline RQ30S2 |
72 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Design for the superheated steam drum safety system – safety valve with auxiliary equipment, steam pipelines and silencers – Units A1 and A2 |
71 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Design for the live steam safety system – safety valves with auxiliary equipment, steam pipelines and silencers – units A1 and A2 |
70 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Main mechanical design for adaptation and reparation of central heating installation for the building of the Department of Mining and Geodesy Measuring of TPP-CM Kostolac |
69 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Main design for connecting the primary heating network for the Bazenska Street in Kostolac |
68 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Main Design for the heating system of the objects belonging to the town’s market area |
67 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Main mechanical design for reconstruction and adaptation of the heating substation of the ATC zone including secondary waterheating network for the Kostolac town |
66 | 2015 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Main design for reconstruction and adaptation of the primary heating network for Kostolac village |
65 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Installation of AUMA drive on mill door stopple, “TPP-CM Kostolac” |
64 | 2014 | MILITARY TECHNICAL INSTITUTE | High pressure installation overhaul of the wind tunnel T-38 |
63 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” – TPP KOLUBARA | Installation of two valves with actuators on the sealing steam system of the turbine unit no. 3 in TPP Kolubara |
62 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” – TPP KOLUBARA | Maintenance of the hydraulic unit on the HP and LP reducer station of 110 MW Unit |
61 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” – TPP MORAVA, SVILAJNAC | Overhaul of the rotary railcar dumper |
60 | 2015 | PUBLIC UTILITY COMPANY “BEOGRADSKE ELEKTRANE” | Main design for Boiler unit “Železnik” for natural gas supply |
59 | 2014 | ELECTRIC INDUSTRY OF SERBIA, BRANCH “HPP ĐERDAP” | Design and replacement of command panels for the vlave chamber of HPP Vrla 2, 3 and 4 |
58 | 2014 | CCI SWITZERLAND AG | Assembling the hydraulic installation on by-pass valves in “Kostolac B” |
57 | 2014 | EPS OGRANAK „TERMOELEKTRANE NIKOLA TESLA” | Annual maintenance of components of the electric control device for controling the safety valves on the boilers no. 1, 3, 4, 5 and 6 |
56 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS AND COAL MINES KOSTOLAC” | Maintenance of hydraulic cylinders |
55 | 2014 | SMEDEREVO STEELWORKS “ŽELEZARA SMEDEREVO” | Repairment of the flow meter |
54 | 2014 | ALSTOM POWER SP. Z.O.O. | “Creation of 3 Main mechanical designs: connecting an auxiliary unit for generator seal oil; connecting an auxiliary unit for supplying the generator stator with cooling water; connecting an auxiliary unit for generator rotor cooling hydrogen; |
53 | 2015 | IEE LTD. | Standardization of the technical documents for HPP “Zvornik” |
52 | 2014 | ELECTRIC POWER INDUSTRY OF SERBIA, BRANCH “THERMAL POWER PLANTS NIKOLA TESLA” | Manufacturing of hydraulic cylinders Ø 100 x 370 [mm] and procurement of valves for process regulation |
51 | 2014 | ALST LTD. | General design for construction of mini hydro power plant “Rlička” |
50 | 2014 | ALST LTD. | General design for construction of mini hydro power plant “Jašice 1” |
49 | 2014 | ALST LTD. | General design for construction of mini hydro power plant “Vučja Rupa” |
48 | 2013 | “ADMINISTRATION FOR JOINT SERVICES OF THE REPUBLIC BODIES”, GOVERNMENT OF THE REPUBLIC OF SERBIA | Main mechanical and electrical design of gas boiler unit for heating “Deputies Club” and accompanying residental object in Tolstojeva street, Belgrade |
47 | 2013 | NIS- PANČEVO OIL REFINERY | Control and examination of processing instalations on hydrogen generation plant within NIS – Pančevo Oil Refinery |
46 | 2013 | THERMAL POWER PLANTS AND COAL MINES “KOSTOLAC” | Design for automation of secundary thermal distribution substations in Kostolac |
45 | 2013 | ELECTRIC POWER INDUSTRY OF SERBIA “PP KOLUBARA” VELIKI CRLJENI | Control and examination of fuel (LPG and diesel) instalations for boiler burners at Veliki Crljeni Power Plant |
44 | 2013 | ALST LTD. | Study report for the construction of mini hydro power plant “Jašice 1” |
43 | 2013 | ALST LTD. | Study report for the construction of mini hydro power plant “Rlička” |
42 | 2013 | ALST LTD. | Study report for the construction of mini hydro power plant “Vučja Rupa” |
41 | 2013 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Installation of control and measuring equipment for operating turbine units A and B |
40 | 2013 | SUNOKO LTD. VRBAS | Reparation of the control of hydraulic installation for truck discharge device in Sugar Plant Vrbas |
39 | 2013 | ELECTRIC POWER DISTRIBUTION BELGRADE LTD. | Main design of telecomunication, transformer station 35/10kV “Železnik” |
38 | 2012 | ELECTRIC POWER INDUSTRY OF SERBIA “PP KOLUBARA A” | Electro-pneumatic control panels for operating safety valves at the unit of 110 MW |
37 | 2012 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Installation of control and measuring equipment for operating turbine power units A and B and installation of control valves for cooling turbine generator HPP “VRLA 4” |
36 | 2012 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Installation of control and measuring equipment for both pumps and equipment for cooling system at Pumped-storage Power Plant “Lisina” |
35 | 2012 | THERMAL POWER PLANTS NIKOLA TESLA – TENT A, OBRENOVAC | Manufacturing and installation of a device for rotational speed measuring of the turbine. Generator no. 2 (210 MW) |
34 | 2012 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Basic design for maintenance investments for hydraulic and hydro-mechanic equipment of lock “Bečej” |
33 | 2012 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Basic design for maintenance investments for hydro-mechanic equipment of lock “Novi Bečej” |
32 | 2011 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Basic and main design for repairment of lock and sluice “Šebešfok”, Baja–Bezdan canal – hydro-mechanical design. |
31 | 2011 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Installation of: lubricating system for bearings of turbine A, installation of the measuring and regulatory equipment on turbines A and B and installation of the regulatory valves for turbine cooling A and B at HPP “Vrla 2” |
30 | 2011 | ELECTRIC POWER INDUSTRY OF SERBIA, KRALJEVO (DEPARTMANT IN ČAČAK) | Investment maintenante of the MHPP “Moravica” in Ivanjica – Hydraulic system for the turbine regulation, design and performance |
29 | 2010 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Installation of hydraulic equipment for operating the auxiliary drives of the Pelton’s turbine and installation of regulatory valves for turbine cooling, HPP “Vrla 1” |
28 | 2010 | THERMAL POWER PLANTS AND COAL MINES “KOSTOLAC” | Reconstruction of PIV variator’s drive for coal batcher and feeder |
27 | 2010 | THERMAL POWER PLANTS AND COAL MINES “KOSTOLAC” | Adaptation of hydraulic generators and manufacturing of hydraulic installation for coal bunker shutter drive |
26 | 2010 | ELECTRIC POWER INDUSTRY OF SERBIA “TPP KOLUBARA A” | Electro-pneumatic control panels for operating safety valves at the unit of 36 MW |
25 | 2010 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Basic design for maintenance investments for hydro-mechanic equipment of the lock “Botoš” |
24 | 2009 | PUBLIC WATER MANAGEMENT COMPANY “SRBIJA VODE” – WMC “MORAVA”, NIŠ | Replacement and installation of new measuring and regulating equipment on dam “Barje”, Leskovac, as part of the reconstruction of control panel and measuring and regulating equipment |
23 | 2009 | PUBLIC WATER MANAGEMENT COMPANY “SRBIJA VODE” – WMC “MORAVA”, NIŠ | Replacement and installation of new measuring and regulating equipment on dam “Bovan”, Aleksinac, as part of the reconstruction of control panel and measuring and regulating equipment |
22 | 2009 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Detailed design and execution of hydraulic installation for control of Mini hydropower plant “Studenica” |
21 | 2008 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Study report of overhaul – renovation of hydro-mechanical equipment of the sluice “Kucura” |
20 | 2008 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Study report of the overhaul – renovation of hydro-mechanical equipment of the lock “Bezdan” |
19 | 2008 | FACULTY OF MECHANICAL ENGINEERING, UNIVERSITY OF KRAGUJEVAC | Hydrodynamic pulsator HP2007 |
18 | 2008 | PUBLIC WATER MANAGEMENT COMPANY “SRBIJAVODE” | Preliminary design and feasibility study for building a small hydro power plant on the river Đetinja – MHPP “Vrutci”. |
17 | 2008 | ELECTRIC POWER INDUSTRY OF SERBIA “TPP KOLUBARA A” | Electro-pneumatic control panels for operating safety valves at the unit of 36 MW |
16 | 2008 | SERBIAN RAILWAYS JSC. | Boiler overhaul with documentation – Document compendium for additionally overhauled equipment of the boiler and heating substation in maintenance depot EMV no.0110/08 |
15 | 2008 | BELGRADE CITY TRANSPORT | Repairment and reconstruction of vessel suspension in a conveyance with documentation. – Study report of the tank repairment s/n 129 installed in the truck ТАМ 130Т-11B-4,3 no. 117/08 |
14 | 2007 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” Ltd. | Revision of preliminary design for reconstruction of electro-hydraulic drive for overflow dam HPP “Đerdap 2” – Hydraulic equipment. |
13 | 2007 | PUBLIC UTILITY COMPANY “BEOGRADSKE ELEKTRANE” | Overhaul and examination of Voith’s couplings type 826-SL-II |
12 | 2007 | SERBIAN RAILWAYS JSC. | Technical documentation for air manifold at compressor station in maintenance depot EMV no.101/07 |
11 | 2007 | SERBIAN RAILWAYS JSC. | Izvođenje sanacije i dokumentacija – Elaborat sanacije finog prečistača vazduha br. 061 na kompresorskoj stanici u depou za održavanje EMV br. 102/07 |
10 | 2007 | SERBIAN RAILWAYS JSC. | Study report for the repairment of the fine air filter no. 062 at compressor station in maintenance depot EMV no.103/07 |
9 | 2007 | SERBIAN RAILWAYS JSC. | Boiler overhaul with documentation – Document compendium for additionally overhauled equipment of the boiler in maintenance depot EMV no.0111/07 |
8 | 2007 | SERBIAN RAILWAYS JSC. | Boiler overhaul with documentation – Document compendium for additionally overhauled equipment of the boiler in maintenance depot EMV no. 0211/07 |
7 | 2006 | ELECTRIC POWER INDUSTRY OF SERBIA “HPP ĐERDAP” LTD. | Revision of basic design of the electro-hydraulic drive replacement on the ship lock HENS “Đerdap 1” |
6 | 2006 | PUBLIC WATER MANAGEMENT COMPANY “VODE VOJVODINE” | Study report of the overhaul – renovation of the hydro-mechanical and hydraulic equipment of the ship sluice “Brana na Tisi”. |
5 | 2006 | SERBIAN RAILWAYS JSC. | Study report of the 800l tank repairment for the passenger section Belgrade no. 3010/06 |
4 | 2005 | SERBIAN RAILWAYS JSC. | Study report of the expansion tanks no. 481 and 487 in boiler ZOVS 15 April – Makiš, Beograd |
3 | 2005 | THERMAL POWER PLANTS NIKOLA TESLA – TPP “MORAVA” OBRENOVAC | Reconstruction of coal feeder drive – PIV variator FAC5. |
2 | 2005 | ARMED FORCES OF SERBIA AND MONTENEGRO | Reconstruction of hydro-mechanical equipment for putting up the antenna system OVERLOOK. |
1 | 2003-2014 | SMEDEREVO STEELWORKS “ŽELEZARA SMEDEREVO”/U.S. STEEL SERBIA, LTD. | Overhaul, refill and testing of spacers (on automatic hydraulic simulation table) |