TPP-HP NOVI SAD

ELABORATION OF MAIN DESIGN, AS-BUILT DESIGN, ASSEMBLY AND DISASSEMBLY OF THE EQUIPMENT, EXAMINATION AND STARTUP OF THE MODERNIZED TURBINE CONTROL AND PROTECTION SYSTEM IN TPP-HP NOVI SAD

In the Thermal Power Plant – Heating Plant “Novi Sad”, modernized turbine control and protection system was designed and installed by IMP Project ENGINEERING.

Existing hydraulic control and protection system was replaced with new, reliable and precise electro hydraulic components which are part of the new turbine control and protection system.  New protection system is based on hydraulic 2of3 safety block. The control oil pipeline was reconstructed.

After installation, the new turbine control and protection system were tested and commissioned.