MILITARY TEHNICAL INSTITUTE
HIGH PRESSURE INSTALLATION OVERHAUL OF THE WIND TUNNEL T-38
The overhaul included the following:
- BAUER air dryer overhaul (air pressure of 220 bar)
- Purolator filter overhaul
- H. Tiefenbach GmbH & Essen electromagnetic valve overhaul
- Actuatro overhaul for starting the segment rotators
- Paton filling with specimen diffractogram
- Eugen Seitz valve overhaul
Manufacturing of the hydraulic cylinders (ø100×370) for with a chromized pipe