MILITARY TEHNICAL INSTITUTE

HIGH PRESSURE INSTALLATION OVERHAUL OF THE WIND TUNNEL T-38

The overhaul included the following:

  • BAUER air dryer overhaul (air pressure of 220 bar)
  • Purolator filter overhaul
  • H. Tiefenbach GmbH & Essen electromagnetic valve overhaul
  • Actuatro overhaul for starting the segment rotators
  • Paton filling with specimen diffractogram
  • Eugen Seitz valve overhaul

Manufacturing of the hydraulic cylinders (ø100×370) for with a chromized pipe