BU ŽELEZNIK
DESIGN FOR RECONSTRUCTION AND ADAPTATION OF THE BU ŽELEZNIK
FOR GAS SUPPLY PURPOSES
The Design includes a complete reconstruction of the existing boiler room in Železnik (19 MW) and its adaptation for the use of gas as a fuel. A complete modification of three boilers and their auxiliary machine installation is scheduled. A design for gas supply conduit and designs for all reserve fuel installations (heating oil #2) were made.