TPP KOLUBARA THE SEALING STEAM SYSTEM
INSTALLATION OF TWO VALVES WITH ACTUATORS ON THE SEALING STEAM SYSTEM OF THE TURBINE UNIT NO. 3 IN TPP “KOLUBARA”
Within the reparation of the turbine unit A3 in TPP “Kolubara” (65 MW), the reparation of a part of the turbine regulation and the sealing steam system. Regarding the reparation of the part of the turbine regulation, the modernization of the fast closing valves was conducted. As for the reparation of the sealing steam system, the control valves with AUMA actuators on the sealing steam pipeline were installed. In order to monitor the process, two pressure transmitters were installed on the collector.