TPP KOLUBARA HYDRAULIC UNIT

MAINTENANCE OF THE HYDRAULIC UNIT ON THE HP AND LP REDUCER STATION OF THE 110 MW UNIT

During the overhaul of the unit 110 MW in TPP “Kolubara” in 2015, we conducted disassembling of all components of the hydraulic unit that were assigned for maintenance, their transportation to the hydraulic lab in the Institute for diagnosis and repairs of servomotors, piston accumulators, pumps and motors, and their transportation back to the TPP “Kolubara” for their assembly, testing and startup. In 2014, all the components needed for the overhaul were purchased.