HPP Zvornik
STANDARDIZATION OF THE TECHNICAL DOCUMENTS FOR HPP “ZVORNIK”
For the purpose of reconstruction of HPP “Zvornik”, we participated in the production of “Design for civil permit” as well as of the “detailed design”.
IMP Project ENGINEERING was tasked with producing the mechanical part of the design. This part includes design of turbine, turbine control system, water cooling system, compressed air system as well as the generator design. Reconstruction includes replacement of the turbine runner and all of turbine followup systems for the purpose of increasing nominal power to 4 x 31.4 MW.